At the Neuer Graben 39 in Osnabrück, a good 15 m of trip railings from the Münster system were installed as a circular bed border with a diameter of 5 m.
Project participants | |
---|---|
Realisation | May/June 2017 |
Execution | 15 running meters of the trip rail system Münster |
Address | Neuer Graben 39, 49074 Osnabrück |
Plan route