In Peulendorf, the knee railings from the Münster system were installed.
Planer | |
---|---|
Project participants | |
Realisation | Winter 2006/2007 |
Execution | 344 m length of knee railing, system Münster, 3 rails |
Address | 96110 Scheßlitz |
Plan route