return
Trip rail Ulm

Erlangen, Hans-Geiger-Straße

In a newly designed residential area in Erlangen, the border railing type Ulm was installed to visually separate it from the pavement. At the same time, the planting is protected from being stepped on or driven over.

Project participants
Realisation Autumn 2021
Execution

72 running metres border railing type Ulm, with straight connecting tube (Ø34mm), end pieces with rounding, all steel parts hot-dip galvanised, colour coating micaceous iron ore grey (DB703)

Address Hans-Geiger-Straße, 91052 Erlangen
Plan route